Technical Centre

Our moulds are put through their paces in our test centre

There are six single-component, two-component and three-component machines in a separate room in our test centre with 20 to 275 t clamping force which are ready for sample inspections and customer prototype acceptance and release procedures.

Samples of all moulds with up to 275 t clamping force undergo in-house inspections including tests, where required, certifying their process capability to customer specifications. Measurement of parts and statistical analyses are routine aspects of day-to-day operations.

We also do pre-production runs and small batches for our customers on our injection moulding machines.
Our new building which was added in 2009 also provides space for customer machines which can be run in until the mould or an entire line is ready for series production and then moved to the production site.